Aker BP Receives Consent for Bøyla Drilling
The Petroleum Safety Authority has given Aker BP consent for exploration and production drilling of a well in the Bøyla field.
Aker BP is the operator for production licence 340/869. The Bøyla field is in the North Sea, around 200 kms from land (Karmøy). The well has the following coordinates: 59° 20′ 29.01″ N 01° 49′ 55.32″ E. Water depth at the site is around 119 metres.
The operation is scheduled to begin in Q1 2019 and to last 94 days.
Aker BP must apply for separate consent to begin test production from the well.
Drilling is to be carried out using the Scarabeo 8 mobile drilling facility. This is a semi-submersible drilling facility of the Moss CS50 MKII type, operated by Saipem Norge. It was built in Russia and Italy and put into service in 2012. The facility is classified by DNV GL and registered in the Bahamas.
Source: www.youroilandgasnews.com