Well Kick in North Sea Halts Shell Operation

Graphic for News Item: Well Kick in North Sea Halts Shell Operation

Shells ‘Plug and Make Safe’ operation on board the Brent Bravo was halted Wednesday after a Well ‘Kick’ turned into an uncontrolled incident which ejected heavyweight drill pipe and damaged the Platforms Top Drive System.

Oil and Gas People were made aware of the incident from a source on board the Platform who stated: “The incident was absolutely frightening! Heavyweight drill pipe spewed out of the hole and wrecked the top drive”.

A spokesperson for Shell has confirmed that some damage has occurred to the Top Drive system but described it as “not significant”.

Shell released the following statement in response: “Shell can confirm that during routine work on the Brent Bravo platform on 29th June, a small blockage occurred in a drilling pipe. There was no spillage on board and no harm to personnel working on the platform. Shell has commenced an investigation.”

 

Leave a Reply

Your email address will not be published. Required fields are marked *

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.